KitLog pro

Powered By Kitlog Pro v2.0

Michael's Cozy Web Site
< Previous Log Entry          Next Log Entry >
' style=
Date:  7-12-2014
Number of Hours:  5.00
Manual Reference:  Step 1
Brief Description:  Fabrication of Parts

The ribs and bulkheads for the strake were layed out on two sheets of H45 PVC. The sheets were joined together and covered with 1 ply BID. I got this idea from the Cozy Girlls. This process has saved a lot of wasted material and time compared to cutting out each individual piece and covering it individually.
For the entire strake I will be using E-Z Poxy 10A with 87 B Slow hardner. This is based on recommendations from many who have successfullty used this system without any fuel attack problems. There are two key steps with this system that must be done correctly. First the mixture ratio must be exact. I use a scale so I have no issue with this. Second, it must be postcured. This will take place after the strake is completed.
' style=

Foam with parts layed out.

Foam with parts layed out.

' style=

1 BID Layup

1 BID Layup

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.