I finished cutting the slots and reinstalled the jigs. I installed some supports on J-5, J2, and between J-1 and J-2 to keep everything perpindicular and in place. I installed the lattice into the slots using 5 min epoxy and wire nails. I installed the plywood flanges at the top of the jig.