11/25/2007 Started to lay out the cuts needed on the spar jig. 11/29/2007 Cut out 1/2 the vertical back board 11/30/2007 Cut out the other 1/2 of the vertical back board 12/01/2007 Shaped by sanding and started to lay out the bottom boards 12/07/2007 Layed out all the boards and bondo'd them to the table