KitLog pro

Powered By Kitlog Pro v2.0

Michael's Cozy Web Site
< Previous Log Entry          Next Log Entry >
' style=
Date:  8-10-2007
Number of Hours:  13.50
Manual Reference:  Step 1
Brief Description:  Cutting the Foam Cores and Bonding to Torque Tube

08/10/2007 I cut out the foam core templates
08/11/2007 I restrung the hot wire. I alos started prepping the torque tubes. On one side I riveted the NC-2 into place and sealed it with IsoCyan glue.
08/12/2007 I finished the other torque tube by riveting NC-2 in place and sealing with IsoCyan glue. I cut out the notch for the hinge. I hotwired all the elevator foam cores with Kenneth's help.
08/20/2007 I fit the elevator cores to the torque tubes. I sanded them down a little to allow a snug but easier fit. I took a tent pole and epoxied sanding paper to it. This worked very good. I micro'd the torque tubes in place using NC-7 jigs to set the correct angle or rotation of the torque tubes.
' style=

Elevator Cores and Torque Tubes

Elevator Cores and Torque Tubes

' style=

Torque Tube fitted into core

Torque Tube fitted into core

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.