KitLog pro

Powered By Kitlog Pro v2.0

Michael's Cozy Web Site
' style=
Date:  4-19-2008
Number of Hours:  3.00
Manual Reference:  Step 6
Brief Description:  Constructing the Land Brake

I used micro and attached the hard point LB23 to the bottom. I layed up 3 layers of BID in alternating widths to provide some lap. I also floxed in the hinge to the LB23 and drilled the holes and installed the bolts in the brake hinge. I cut a channel near the left end opf the hinge into the foam to allow the hinge pin to be pulled.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.