Kenneth and I hot wired the Leading edge from the Left and Right Center and Outboard Cores. I micro'd the plan form blocks together for the left FC2 and FC3, right FC4 and FC5, and the left FC1. I probably should have waited on the FC1 since I still need to cut off the inboard section for the aileron control rod connections. I will have to saw cut this off now. I will try to hotwire the right FC1.