KitLog pro

Powered By Kitlog Pro v2.0

Michael's Cozy Web Site
' style=
Date:  3-15-2019
Number of Hours:  1.00
Manual Reference:  Step 5R
Brief Description:  Outside Layups - Port

The peel ply was removed and the cross member and the bondo was removed. During the removal of the bondo, I must have gotten more aggressive than I thought. Some of the underlying BID from the original wing tip reinforcement was sanded away. A very small diameter (~3/8" to 1/2" diameter) section of the UND under the BID was exposed.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.