KitLog pro

Powered By Kitlog Pro v2.0

Michael's Cozy Web Site
' style=
Date:  8-30-2017
Number of Hours:  3.00
Manual Reference:  Step 3
Brief Description:  Cowling Installation

The 5 BID flanges were layed at the spar and over the cosmetic corner piece. It was connected with the fuselage firewal flange that was previously installed.

The 5 BID flanges at the wing root were extended to the trailing edge.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.