KitLog pro

Powered By Kitlog Pro v2.0

Michael's Cozy Web Site
' style=
Date:  8-13-2017
Number of Hours:  1.00
Manual Reference:  Step 3
Brief Description:  Cowling Installation

After the Paper machete was dried out, the surface was filled with spacking compound. This was smoothed as much as possible and allowed to dry.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.