KitLog pro

Powered By Kitlog Pro v2.0

Michael's Cozy Web Site
' style=
Date:  11-21-2020
Number of Hours:  8.00
Manual Reference:  Step 2
Brief Description:  Firewall Insulation and Liner

In addition to the equipment that was removed, I decided to install blind nuts on all of the equipment on the inside of the firewall that would have bolts and/or nuts covered up by the insulation blanket and liner. The only piece that still has bolts that will have to protrude through the liner is the fuel pump. The list of equipment that was removed and reinstalled with blind nuts is below.

1. Master Solenoid
2. Starter Solenoid
3. Amp Shunt.
4. ElectroAir Electronic Ignition Control Module

The Vertical Power box was removed to allow access to the tank vent manifold.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.