Date:  2-16-2018
Number of Hours:  60.00
Manual Reference:  Step 3
Brief Description:  Cowling Installation

Due to my work on the project in Louisiana, I slowed down on my work on the cowling. I did complete the cowling today. I have not been logging each day that I have worked so the 60 hours is a guess. Some of the highlights.
- Completed all of the flanges and installed CLocs from SkyBolt.
- Removed the exit that was intended for the exhaust pipes since my exhaust pipes are in the cowl. The right side has a small hump to provide at least 1 " clearance from the exhaust pipes.
- Completed the rear flange and installed the CLocs.
- Repaired some of the flanges on the lower firewall. They were not fitting tight on the cowl, so I cut them out and reinstalled new ones.
- Installed the Oil door. Used one CLoc fastener to secure the door.
- Installed the lower inlet ramp from the NACA duct.

There are still a few CLoc fasteners to install on the lower cowling and some adjustments that need to be made everywhere.