KitLog pro

Powered By Kitlog Pro v2.0

GREGORY'S WEB SITE
' style=
Date:  3-10-2019
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Debur, Debur, Debur

Durburred, a lot today...most of the bulkheads are done and I'm hopin gto prime everything soon. Built the last two bulkheads (F711, F712) which was kind of fun. More fabricating which is always more fun than match drilling and deburring.
Throughout the week I plan to sand and prep all the parts for priming. Hope to prime next weekend and maybe start putting the aft fuselage.
' style=

Pile of deburred parts

Pile of deburred parts

' style=

Drilling F711 bulkheads and the reinforcing bars

Drilling F711 bulkheads and the reinforcing bars

' style=

F711 and F712, debur these, prime and rivet

F711 and F712, debur these, prime and rivet

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.