KitLog pro

Powered By Kitlog Pro v2.0

GA Aerospace’s Web Site
' style=
Date:  1-24-2020
Number of Hours:  3.80
Manual Reference:  
Brief Description:  46iS-08

01/23/20: 1.8Hrs
1: The rotax ECU attach holes on F-1202B-1 were final-drilled #12.
2: the Rotax ECU was attached to the F-01202B-1
3: The ECU Lane A, Lane A2 and B were routed (the cam machanisms were not locked on the ECU connectors.

Worked on step 4.


01/24/20: 2Hrs
4.The .750 bushing was created from BUSHING-AL.197X.313X.968 and the two ECU cables were secured to the engine mount.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.