Date:  1-23-2020
Number of Hours:  1.83
Manual Reference:  
Brief Description:  46iS-07

01/02/20: 0.5Hrs
1. The Gnd Starter Relay wire from the Regulator A bundle was cut and sealed with heat shrink.

01/23/20: 1.33Hrs
2. All of the regulator A ground terminals were attached to the bottom of the fuse box.
3. The Fuse box was temporarily installed to the firewall.
4. The fuse box lane A and B were installed into the fuse box.
5.Generator A and B cables were connected to their corresponding connectors on the fuse box.