Date:
10-30-2019
Number of Hours:
10.80
Manual Reference:
Brief Description:
49iS-02
10/30/19 6.7Hrs
Step 1: Nutplates were riveted along the sides of the F-01246S. The holes rivets were not dimpled because they were already dimpled.
Step 2: NA
Step 3: Nutplates and F-01246E were riveted on F-01246S web. The F-1246A was already riveted.
10/31/19 4.10Hrs
Step 4: The hole on the F-12134 was countersunk #27. The screw, nuts and the spring were assembled as required.
Step 5: The two MS20151L08 were riveted together.
The slot in the F-12134 was filed so the screws move freely.
Step 6 : The spring end was attached to the F-0146E and the whole Eco Stop Assembly was put in place.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-12iS B Home
Category
# Logs
# Hours
All
443
3643
.Avionics
52
188
.Empennage
55
331
.Finish
96
569
.Fuselage
115
758
.Inventory
21
92
.PAP
11
1
.Powerplant
39
202
.Service Bulletin
14
15
.Wings
24
249
Batteries Log
1
ECU Cycles log
1
Finish Kit
1
612
None
1
0
Painting process
9
255
PAP
1
Powerplant
2
371
RV-12iS A Home
Copyright © 2001-2024 Matronics. All Rights Reserved.