03/10/20: 3.5Hrs 1 & 2: The holes on F-01207C-L&R had already been match-drilled #30 so the F-1284L&R were riveted to them. 3: Both F-01273-1 were clecoed to the fuselage. 4: The two holes called out on each F-01270A-1were final-drilled #19. Worked on 5.
03/11/20: 2.33Hrs Continued working on step 5.
03/23/20: 2.18Hrs 5: All of the rivet holes required to attach the tailcone to the fuselage were installed.