02/19/20: 0.5Hrs The 1/16" spacers for step 1 were created.
02/20/20: 1.67Hrs 1: The previously created spacers were inserted between WD-01214 and WD-1215. 2: Both WD-01214 were pushed outboard until they were firmly against the spacers between them and A-1207. The parts were clamped together. 3: Adjustments were made to the pushrods in order to get the same distance between both bolts and F-01206F-2. 4: The two holes on each WD-1215 were used to match-drill #30 both WD-01214.
02/21/20: 2.67Hrs 5: Both WD-01214 and both WD-1215 were removed from the fuselage. 6: The two wings were removed from the fuselage 7: WD-01214 and WD-1215 were clecoed and clamped together 8: The two bottom holes on the bottom of WD-1215 were used to match-drill #30 both WD-01214. 9: The previously match-drilled holes on WD-01214 and WD-1215 were final-drilled #12. 10: Both WD-1215 were reinstalled.