02/07/20:15.33 1: All holes were drilled as instructed and in the order given by figure 1. 2: The holes common between the roll bar and the aft window were final-drilled #36 and the rollbar was tapped 6-32, screws were installed. 3: Every other screw was removed. 4: Electrical tape was taped to the exterior of the window aligning the tape's forward edge with the aft edge of F-1231A FL&FR. 5: T-01231 circumference was traced onto the aft window. 6: The window was removed. Worked on step 7.
02/11/20: 9.16Hrs 7: All of the holes on the window were final-drilled #26 8: The forward edge of the window was trimmed until it aligned with the aft edge of F-1231A FL&FR. 9: The top and bottom edges of the window were chamfered. 10: The T-01231 circumference marked on the window was trimmed off and left a 1/32" clearance. 11: All scratches were removed with 360, 600, 1500, 2000 and finally 5000 grit sandpaper, then polished. 12&13: The edges of the turtle skins were broken and the window attach holes were final-drilled #26.