KitLog pro

Powered By Kitlog Pro v2.0

GA Aerospace’s Web Site
' style=
Date:  1-25-2019
Number of Hours:  27.36
Manual Reference:  
Brief Description:  18-06

01/22/19: 6.6Hrs
1. A-1202B and A-1202A-R to the right flaperon spar assembly and were pinched to make sure they laid flat against the ribs.
Step 2 was worked on for the right flaperon.

01/23/19: 7.25Hrs
Step 2 was worked on for the right flaperon but paused it.
A-1202B and A-1202A-L to the left flaperon spar assembly and were pinched to make sure they laid flat against the ribs.
2. A-1202B and A-1202A-L were riveted to the assembly.
Step 3 was worked on for the left flaperon.

01/24/19:10.93Hrs
3.A-1201C-L was clecoed and riveted to the left flaperon assembly.
4.A-1201A-L was clecoed and used to match-drill #30 holes into A-1210-L&R, the other #40 holes on A-1210-L&R were final-drilled #30.
5. A-1201A-L was deburred, as well as A-1210-L&R, and riveted to the flaperon assembly.
A-1201B-L was riveted to the assembly.
MDM3614M had loctite 243 applied and were installed to the assembly.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.