KitLog pro

Powered By Kitlog Pro v2.0

GA Aerospace’s Web Site
' style=
Date:  6-28-2019
Number of Hours:  17.26
Manual Reference:  
Brief Description:  17-02

01/23/19: 1Hr
1. Deburring and removing vinyl.

01/24/19: 7.1Hrs
2. W-1201-L was dimpled in two places as instructed.
3. The W-1201A doubler was clecoed to the skin.
4,5 . Eight holes were final-drilled #20, then the doubler was un-clecoed and it was deburred along with the skin.
6,7 The skin was completely clecoed and riveted to the skeleton.

06/28/19: 8.83Hrs
8. The #30 hole used for the tie-down was final-drilled 3/8.
9. The W-1203-L was clecoed and riveted to the skeleton.
Step 10 was worked on.

07/01/19: 0.33Hrs
10. The W-1202-L sking was clecoed and riveted to the skeleton.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.