KitLog pro

Powered By Kitlog Pro v2.0

GA Aerospace’s Web Site
' style=
Date:  1-22-2019
Number of Hours:  2.25
Manual Reference:  
Brief Description:  15-07

1. Nose ribs were clecoed and riveted to the right spar as follows working inboard:
2-4:
8 aft-trimmed W-1208-L.
4 fwd&aft trimmed W-1208-L.
1 fwd&aft trimmed W-1208-R.
1 fwd&aft trimmed W-1208-L with nutplate and W-00028.

5. The right stub spar assembly was riveted to the forward flanges of W-1208s.
6. Snap bushings were installed in all of the nose ribs.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.