Date:  1-17-2019
Number of Hours:  15.53
Manual Reference:  
Brief Description:  14-02

01/15/19: 2.75Hrs
1. W-1208 were clecoed to each stub spar.
Worked on 2.

01/16/19: 8.1Hrs
2. All of the stub spar flanges were countersunk #30 120.
3. The three inboard holes on both sides of both stub spars were countersunk #40.
4. Both W-1208B and W-1208C were riveted together.
5,6 Four pairs of W-1216L and W-1216R were riveted together in 8 locations.
7. W-1212B L&R were countersunk #30 in 2 holes each.

01/17/19: 4.68Hrs
8,9. . One bearing was inserted into W-1212A and a pair of W-1212B L&R were clecoed to it, then, all of the parts were riveted together.
10. The hinge bracket assembly was primed.