01/07/19: 4.5Hrs 1. F-1211G was created by match-drilling, trimming and tapping as instructed in the manual. 2. F-1211B was trimmed and deburred.
01/08/19: 2.42Hrs 3. A total of 16 holes were countersunk #40 and 3 holes were countersunk #30 on F-1211B. 4. F-1211D were separated and deburred. 5. F-1284 were separated. 6. F-1211C L&R were separated.