Steps 2,3 and 4 do not apply, since we already have wedge tools. 5. A total of 8 holes were final-drilled on VS-1210. 6. VS-1210 were separated. 7. VS-1211 were marked and separated. 8. VS-1211 A&B were clecoed between two VS-1210 and then 5 holes were match-drilled #30 on each one, 9. A bearing was inserted into VS-1211A and then it was riveted to the two VS-1210 that it was match-drilled with. 10. The previous step was performed exactly the same but using VS-1211B.