Date:  7-11-2020
Number of Hours:  3.33
Manual Reference:  
Brief Description:  42MiS/U-21

03/04/20: 2.53Hrs
1: HW-00004 was riveted to F-01215-R-1.
2: The flap motor, switch and power outlet wires were routed through F-01203A-1.
3: The flap switch was installed along with its gasket onto F-01246.
4: C6286 was grounded to F-01215-R-1.
5 & 6: The five wires on the flap motor were stripped and their respective connectors were crimped to them.
7 & 8: The spade terminals on the flap motor were connected to the harness and to the flap switch.
9: The flap motor wires were tie-wrapped to it.

07/11/20 0.8Hrs
10: The USB Dual panel jack was installed onto the F-12101 and connected the wires to appropriate spade connectors

11: The F-12101 was reinstalled.