KitLog pro

Powered By Kitlog Pro v2.0

GA Aerospace’s Web Site
' style=
Date:  3-17-2020
Number of Hours:  3.32
Manual Reference:  
Brief Description:  42MiS/U-13

02/25/20: 1Hr
1: The harness wires were roughly placed onto position.
3: MS2166-1N was installed onto the hole where the hearness is passing through.
5: The HIC connectors were connected to AV-60009.

02/26/20: 1.15Hrs
8 & 9: Three AN931-6-16 grommets were expanded using a socket and a vise.

03/17/20: 0.33Hrs
6: The HIC connectors from the fusebox were connected to AV-60009.
7: The IS Can Bus connector D-sub was changed to one with its retaining standoffs on the backside.

07/09/20 0.49Hrs
2: Wires K6297 and K6298 were connected to the red power leads of the ES CPU Fans.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.