Date:  2-25-2020
Number of Hours:  4.27
Manual Reference:  
Brief Description:  42MiS/U-06

02/24/20: 1.37Hrs
1: CS-G405 foam, was placed over the spacer on the control sticks.
Worked on 2.

02/25/20: 2.9Hrs
2: Safety wire was used to route the control head wire through the control stick.
3: The control head was riveted to the control stick and spacer.
4: A snap bushing was installed on both control stick tubes, also heat shrink was installed on the wires and they were tie-wrapped to the tube.
5: The control head wires were crimped and inserted into a D-Sub 9 Pin connector.
6: Two backshells were trimmed as instructed and the D-sub connector was installed into it.
7: Sticker labels were installed onto the control heads.