KitLog pro

Powered By Kitlog Pro v2.0

GA Aerospace’s Web Site
' style=
Date:  2-7-2020
Number of Hours:  2.08
Manual Reference:  
Brief Description:  42NiS-09

02/06/20: 1.5Hrs
1: The Fusebox was removed from the firewall
2: GEA 24 and F-00074-L drill guide were attached to the firewall.
3 & 4: A total of 4 rivets instead of three were removed in order to cleco F-00074-R-1 to the firewall.
5: The #30 holes on F-00074-L, F-00074-R were match-drilled onto the firewall.
6: The #11 holes on GEA 24 were match-drilled onto the firewall, first using a 3/16" drill bit and finishing with a #11.

02/07/20: 0.58Hrs
7 & 8: All attached guides were removed and F-00074-R-1 and the firewall were deburred.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.