Date:  3-26-2021
Number of Hours:  16.00
Manual Reference:  
Brief Description:  36iS/U-07

19/03/2021 3.5 hours
Worked on the left side, steps 1-5
1. The U-00001B and U-00001A were clecoed to the U-00002.
2. The clecos were removed and the inside was roughened.
3.The threads of the 8-32 screws were coated with wax.
4. The outsidew of the #40 pilot hole was taped.
5. Epoxy and flox were mixed and builded up the areas around the #40 holes in U-00001A and U-00001B.
23/03/2021 4.20 hours
Worked on steps 6-15
6. After ther epoxy cured , three of the #40 holes were final-drilled #27.
7. The U-00001A and U-00001B were removed from the U-00002.
8. The bracket holes in the U-00001A and U-00001B were final-drilled #19
9. The #27 holes were match-drilled #40 and countersank on the U-00001B for nutplates, The holes were deburred.
10. The nutplates were riveted to the U-00001B.
11. The U-00001A and U-00001B were attached with three #6 screws un the nutplates, the clecoed the rest of the holes. The #40 holes were final-drilled #27.
12. The remaining nutplates werre installed on the U-00001B.
13. The #27 holes in the U-00001A were countersank.
14. The tire inflation pilot hole was final-drilled #30.
15. The U-00001B and U-00001A were attached to the U-00002 and to each other,

25/03/2021 3.5 hours
Worked on the right side steps 1-5.

26/03/2021 4.20 hours
Worked on steps 6-15.