Date:  3-30-2021
Number of Hours:  1.90
Manual Reference:  
Brief Description:  36iS/U-13

3/30/2021 1.90Hrs

1. The U-A-1 was match-drilled #40 and countersank.
2. The nutplates were riveted to the U-00005A-1
3. The U-00005A-1 and U-00005B were installed on the WD-01230-1.
4. The clearance between the U-00005A-1 and the WD-1201-1 is al least 1/8.
5. The nose wheel was rotated till the valve stem was aligned directly aft of the axle,
6. The location of the tire inflation access hole was measured and marked. A #30 pilot hole was drilled on the mark.
7. The pilot hole was aligned to the valve stem, the access hole was step-drilled 3/4.
8.The towbar access holes were centered on the towbar lug, the access hole was step-drilled
9. The U-00005A-1 and U-00005B were removed from the WD-01230-1.