Date:  7-9-2020
Number of Hours:  17.37
Manual Reference:  
Brief Description:  29iS/U-08

11/01/18: 2.5Hrs
1. F-01202B-1 was clecoed to the fuselage.
Worked on step 2.

11/02/18: 4.32Hrs
2. All of the holes on F-01202B-1 common to the longerons were match-drilled into it.
The fuselage was vacuumed to remove burr.

01/05/19: 10Hrs
3. The canopy rib assemblies were clecoed to to F-01202B-1 and two holes were match-drilled into F-1202Y.
4. The four most-forward holes on both edges of F-01202B-1 were riveted.
5. The canopy rib assemblies were riveted to the fuselage, the two rivets that attach the F-12132 to the fuselage will be riveted after the aircraft is pending.
6. F-01202B-1 was riveted to the longerons.
7. F-01202B-1 and the canopy rib assemblies were riveted to F-01201A-1 along with the nutplates called out.
8. The canopy rib assemblies were sealed using tank sealant.

7/9/20 .55Hrs

The F-12132s were riveted to F-01202B-1,the installation of these parts was delayed until the interior was painted.