KitLog pro

Powered By Kitlog Pro v2.0

GA Aerospace’s Web Site
' style=
Date:  10-25-2018
Number of Hours:  24.47
Manual Reference:  
Brief Description:  26iS/U-05

10/24/18: 12.22Hrs
1. The bottom flange of the tank ribs were taped.
2. A reversed clamp was used to hold the top skin open.
3. Mixed sealant
4. T-01223 L&R were smeared with sealant, clecoed and riveted to the top skin.
5. T-01228 was riveted to T-01223 L&R and the bushing was installed.
6. T-01224 L&R were smeared with sealant and clecoed to the top skin.

10/25/18:12.25Hrs
7. T-01222 L&R were smeared with sealant and clecoed to the top skin.
8. The clamp was removed and the ribs were riveted to the top skin.
9 The ribs were riveted to the T-01221A
10. The plug rivets from the previous page were sealed.
11. Mixed sealant
12. The corners that the outboard ribs make were sealed.
13. The seam as noted on detail A-A was sealed and smoothened.
14. T-01225 L&R were smeared with sealant and riveted to the tank assembly.
15. T-01229 was sealed and riveted to the top skin.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.