Date:  12-3-2020
Number of Hours:  7.10
Manual Reference:  
Brief Description:  27iS-04

Step1: The VA-265 and the T-01233 were installed.
Worked on 2, 3 and 4 with no success.

10/24/18: 1Hr
Step 2; The F-12127K was fabricated by straighten and cutting off 25 1/4''.

Step 3: 21/32 in were measured from the tank end of the tube and the end of the bend line was marked. The start of bend line was marked at 15/16 in . The tank end of the tube was flared. A 38 degrees bend was made, nut and sleeve were placed over the opposite end of the tube and the sleeve was slipped against the flare.

Step 4: A 90 degtrees bend was made going to the valve. Nut and sleeve were placed over the valve end of the tube. The valve end of the tube was flared and the sleeve was slipped against the flare.

Step 5: The F-12127K was installed. A clamp was placed around the fuel line, which was attached to the F-01206-2.