Date:  6-18-2019
Number of Hours:  5.25
Manual Reference:  
Brief Description:  27iS-02

10/23/18: 3.25Hrs.
1. Fluid fittings were installed into FLF-00014
2. Fluid fittings were installed into FLF-00013
3. The firewall fluid fittings were installed and sealed.
4. The fuel valve handle was drilled 1/4.

10/24/18: 0.5Hrs
5. The fluid fittings for the fuel valve were installed.
6. F-12108B was riveted.

06/18/19: 1.5Hrs
Step 2 was reworked because of a change to the FLF-00013.