Powered By Kitlog Pro v2.0
GA Aerospace’s Web Site
RV-12iS B
.Fuselage
10-16-2018
< Previous Log Entry
Next Log Entry >
Date:
10-16-2018
Number of Hours:
0.66
Manual Reference:
Brief Description:
29iS/U-09
10/16/18: 0.66Hrs
Step 1: Borh L-1 & R-1 F-01201Q were riveted to both L-1 & R-1 F-01201E.
Step 2: Both upper and lower F-01201F-1 were riveted to the F-01201A-1.
Step 3: Both L-1 & R-1 F-01201E were riveted to the F-01201A-1 and F-01201B-1.
Step 4: The lower F-01201F-1 was riveted to both L-1 & R-2 F-01201E.
Step 5: The head of each rivet on F-01201A-1 and F-01201B-1 was covered with a thin layer of fuel tank sealant.
Step 6: The lower F-01201G-1 was riveted to the FF-00088A.
Step 7: Both upper and lower F-01201G-1 were riveted to both L-1 & R-1 F-01201E.
Step 8: The F-1240C was fabricated from the provided AS3-025 material.
Step 9: Match drill #40 was made from F-1240C to F-1240B.
Step 10: Fitting between F-1240B and the fuselage was tested. All the holes in both pieces were deburred and dimpled.
Step11: The F-1240C was riveted to the F-1240B.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-12iS B Home
Category
# Logs
# Hours
All
443
3643
.Avionics
52
188
.Empennage
55
331
.Finish
96
569
.Fuselage
115
758
.Inventory
21
92
.PAP
11
1
.Powerplant
39
202
.Service Bulletin
14
15
.Wings
24
249
Batteries Log
1
ECU Cycles log
1
Finish Kit
1
612
None
1
0
Painting process
9
255
PAP
1
Powerplant
2
371
RV-12iS A Home
Copyright © 2001-2024 Matronics. All Rights Reserved.