Date:  8-17-2020
Number of Hours:  10.26
Manual Reference:  
Brief Description:  23iS/U-08

10/04/18: 1.33Hrs
1. F-1086 and F-1087 were separated.

10/05/18: 5.33Hrs
2. F-1087A and F-1087B were final drilled #40.
3. 6 holes on each of the F-1093 were countersunk.
4. The slot on F-1087 was filed and sanded until the screw mentioned on the manual could move freely.
5. F-1087A&B, F-1092 and F-1093 were riveted together.

10/19/18: 23iS/08: 3Hrs
6. F-1086A, F-1086B, F-1096 and F-01270 L&R were match-drilled #30 then riveted together.

STEP 7 AFTER INTERIORS ARE PAINTED.

08/17/20 .6Hrs
Step 7. The vent door subassembly was installed.