KitLog pro

Powered By Kitlog Pro v2.0

GA Aerospace’s Web Site
' style=
Date:  10-2-2018
Number of Hours:  17.96
Manual Reference:  
Brief Description:  22iS/U-04

10/01/18: 14.63Hrs
1. 18 nutplate holes were countersunk #40 on F-01217 L&R.
2. 4 holes were countersunk #30 on the forward flange of F-01217 L&R.
3. 1 hole was dimpled #30 in F-01217 L&R and F-12131 L&R.
4. The forward hole of F-01217 L and the aft hole of F-01217 R were enlarged to 5/8
5. Final drilled 4 holes #30 on two WD-1204 and on F-1217 L&R.
6. WD-1204, F-12131 L and F-1217 L were riveted together (this was repeated for the right side)
7. Repeat for F-01217-L
10/02/18: 3.33 Hrs
8.F-01217 L&R were riveted to F-01272.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.