09/24/18: 1.83Hrs 1. F-01225-R was riveted to rib #8 and to the pulley bracket assembly. 2. Five nutplates were riveted to F-1225-R 3. F-1253-R was riveted to F-01225-R
9:25/18 8:40-10:40: 4Hrs 4. F-1204R was attached to F-01204B-L and was given a torque of 22lb/in. 5. Floor assemblies were riveted to F-01204A-1.