Powered By Kitlog Pro v2.0
GA Aerospace’s Web Site
RV-12iS B
All
3-29-2021
< Previous Log Entry
Next Log Entry >
Date:
3-29-2021
Number of Hours:
0.10
Manual Reference:
Brief Description:
47iS/U-03
1. The FF-1216 was fabricated.
2. The FF-1217 was fabricated.
3. The FF-1217 was placed over the aft end of the FF-1202 and over the FF-1216.
4. The FF-1217 was double wrapped with safety wires.
5. The FF-1216 was routed.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-12iS B Home
Category
# Logs
# Hours
All
443
3643
.Avionics
52
188
.Empennage
55
331
.Finish
96
569
.Fuselage
115
758
.Inventory
21
92
.PAP
11
1
.Powerplant
39
202
.Service Bulletin
14
15
.Wings
24
249
Batteries Log
1
ECU Cycles log
1
Finish Kit
1
612
None
1
0
Painting process
9
255
PAP
1
Powerplant
2
371
RV-12iS A Home
Copyright © 2001-2024 Matronics. All Rights Reserved.