03/04/20: 2.53Hrs 1: HW-00004 was riveted to F-01215-R-1. 2: The flap motor, switch and power outlet wires were routed through F-01203A-1. 3: The flap switch was installed along with its gasket onto F-01246. 4: C6286 was grounded to F-01215-R-1. 5 & 6: The five wires on the flap motor were stripped and their respective connectors were crimped to them. 7 & 8: The spade terminals on the flap motor were connected to the harness and to the flap switch. 9: The flap motor wires were tie-wrapped to it.
07/11/20 0.8Hrs 10: The USB Dual panel jack was installed onto the F-12101 and connected the wires to appropriate spade connectors