03/03/20: 2Hrs 2: The antenna cable was installed onto the positioned ELT antenna. 3: A snap bushing was modified and installed and placed over the antenna cable. 4: A step drill was used to expand the 1/4" to 3/8", then a bushing was installed. 5: The snap bushings called out were installed onto F-01204B-R-1 & L, F-01204F-R-1 & L, F-01224-R-1 & L. 6: The two F-00200 switch spacers were separated. 7: F6262 was connected to a ES E22-50K spar pin switch.
03/04/20: 0.67Hrs 8: One F-00200 and ES E22-50K were installed onto the bottom of F-01248-R-1 along with F6262. 9: The snap bushings were installed in F-1204C-R & L and F-01204G-R & L
11/14/20 .7Hrs 1: The E-04.8 ELT Antenna was installed onto the F-01205B-1