KitLog pro

Powered By Kitlog Pro v2.0

GA Aerospace’s Web Site
' style=
Date:  2-11-2020
Number of Hours:  19.83
Manual Reference:  
Brief Description:  38iS/U-13

02/06/20: 10.66
Worked on step 1.

02/07/20:15.33
1: All holes were drilled as instructed and in the order given by figure 1.
2: The holes common between the roll bar and the aft window were final-drilled #36 and the rollbar was tapped 6-32, screws were installed.
3: Every other screw was removed.
4: Electrical tape was taped to the exterior of the window aligning the tape's forward edge with the aft edge of F-1231A FL&FR.
5: T-01231 circumference was traced onto the aft window.
6: The window was removed.
Worked on step 7.

02/11/20: 9.16Hrs
7: All of the holes on the window were final-drilled #26
8: The forward edge of the window was trimmed until it aligned with the aft edge of F-1231A FL&FR.
9: The top and bottom edges of the window were chamfered.
10: The T-01231 circumference marked on the window was trimmed off and left a 1/32" clearance.
11: All scratches were removed with 360, 600, 1500, 2000 and finally 5000 grit sandpaper, then polished.
12&13: The edges of the turtle skins were broken and the window attach holes were final-drilled #26.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.