02/04/20: 0.63Hrs 1: F-00063 was clecoed to F-01202B-1 2: All #40 and #27 holes on F-00063 were match-drilled onto F-1202B-1 3: F-00063 was removed and deburred.
02/05/20: 0.7Hrs 4: All the rivet holes on F-01202B-1 were dimpled. 5: All of the rivet holes on F-00063 were countersunk.