KitLog pro

Powered By Kitlog Pro v2.0

GA Aerospace’s Web Site
' style=
Date:  1-10-2020
Number of Hours:  12.00
Manual Reference:  
Brief Description:  37iS/U-06

1. The top cowl was removed.

2,3 .Double sided tape was used to put the spacers on the aft side of the S-1202.

4. .The finals of each hinge were marked.

5. We returned the top cowl to its position and aligned with the S-1202.
6. Clamped the top cowl to the spacers.
8. The top cowl back was place back on the fuselage, then align and center it behind the S-1202

9. . secured the top cowl to the fuselage with tape.

10. The positions of the rivets were marked at the top cowl top top the rivets could be 9/16'' forward from the top edge of the fuselage skin skin, the space between each rivets was 1 inch Starting at 1/4 of an inch from the mark on the tape.

11. The top cowl was removed and Match drill #40 was made.

12. And Step 8 and Step 9 were repeated.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.