KitLog pro

Powered By Kitlog Pro v2.0

GA Aerospace’s Web Site
' style=
Date:  2-4-2020
Number of Hours:  2.20
Manual Reference:  
Brief Description:  48iS/U-08

01/03/20: 1.2Hrs
1: The position of the Heat Muff Assembly was adjusted to avoid interference with the Engine Mount.
Worked on Step 2.
3: A layer of RTV was applied either on the forward and aft side of each of the springs
4: RTV was applied on both sides of the springs, a little RTV was applied at the end of the springs as shown in the figure one.
5: Checked if the 8 springs had both layers of RTV and if it had also been applied at the end.

02/04/20: 1Hr
The bottom cowl was installed and the opening for the exhaust was enlarged accordingly to achieve a 3/4" gap between the pipe and the cowl.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.