11/21/19 4.66 Hrs Step 1: Sharp points of the FF-00090B Heat Muff Ribs were removed.
Step 2: The FF-00090B, FF-00090K Heat Muff Dam were installed as required. The FF-00090K was cleared of the clamp screw, then the clamp was tightened.
Step 3: The inner flages of the FF-00090B were adjusted to provide greater clamping force.
Step 4: The FF-00090H was gently spreaded it and then slided it along its axis over and onto the four FF-00090B. The FF-00090H was aligned as required.
Step 5: The FF-00090H was secureds using the clamps.