KitLog pro

Powered By Kitlog Pro v2.0

GA Aerospace’s Web Site
' style=
Date:  12-9-2019
Number of Hours:  8.68
Manual Reference:  
Brief Description:  35iS/U-09

11/19/19 3.68 Hrs
1. The WD-1201 was attached to the Fuselage.
Worked on step 2.
3. The SF 4048 was greased. The nose fork assembly was painted and slided with both U-611 as required and the MS21025-20 was threaded.

12/09/19 5Hrs
The SF-4048-12 Bushings were greased and then the Nose fork assembly and the two U-611 washers were slided onto the WD-1201. Finally the MS21025-20 was threaded as required.
4. A wire was threaded through the bolt holes used to secure the Nose Wheel and then a spring scale was attached to the end of the wire. Meanwhile, the MS21025-20 nut was tighten until the force of 19lbs was measured.
Using the nut as drill guide #30 holes were match-drilled on both sides of the nose gear leg for the cotter pin.
Step 5 NA.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.