06/20/19: 1.5Hrs 2: F-1207E L & R were prepared by separating them and preparing them by chamfering. 4: F-01273-L-1 was prepared by filling the #30 hole with a rivet. the right one was expanded to 3/8. 5: The nutplate attach rivet holes were dimpled #40 on F-01273 L & R. The nutplates were riveted to them.
03/05/20: 3.97Hrs 1: The forward tabs of the tailcone were bent as instructed. 3: The access hole on the tailcone was dimpled and nutplates were were riveted to it.