KitLog pro

Powered By Kitlog Pro v2.0

GA Aerospace’s Web Site
' style=
Date:  6-19-2019
Number of Hours:  5.04
Manual Reference:  
Brief Description:  32iS/U-11

06/18/19: 2.58Hrs
Worked on step 1 by trimming the aluminum tube, drilling and riveting the AN490s.

06/19/19: 1.66Hrs
step 1 completed.The bearing installation was completed and the flaperon rods were given the dimensions and orientation specified.

02/18/20 .80Hrs
2. the two flapperon pushrod assemblies were passed through their corresponding oblong holes in the center section bulkheads.
3. The forward end of each flaperon pushrod assembly were attached to the F-01263A-1.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.