KitLog pro

Powered By Kitlog Pro v2.0

GA Aerospace’s Web Site
' style=
Date:  11-23-2020
Number of Hours:  1.75
Manual Reference:  
Brief Description:  11iS/U-04

03/14/19: 1Hr
step 1. Two hinge pins were fabricated

11/23/20 .75Hrs

Step 2: Both L & R AST assemblies were installed to the stabilator assembly using hinge pins previously fabricated.

Step 3: Both L & R AST assemblies were attached together.

Step 4: The hinge pins were rotated for their bends to lay against the stabilator assembly. The bent ends of both hinge pins were fastened with safety wire.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.